No. | Name Of Project | Location | Client | Project Type | Date |
12 | Water Supply Riyadh City-Sadd Wasia Lot-6 | RIYADH-KSA SWWC | NWWC | WaterTreatment | 2020 |
11 | Makhram Water Tank/Pump | Qassim -KSA/ (MEWA) | Trading & Development Partnership TDP / Khatib & Alami | Water | 2019 |
10 | Water Supply Riyadh 3 – Wasia – Buildings & Mechanical Networks | RIYADH- KSA NWC | TAQAH – National Water Company | WaterTreatment | 2018 |
9 | Water Supply Riyadh 3 – Wasia – Electrical Systems, Mechanical, Civil & ARCH Design Works For New 33 KV Switchgear Building & Design Works For OHTL / UGC Between Different Areas Of Project | RIYADH – KSA NWC | TAQAH – National Water Company “NWC” | Water Treatment Plant | 2017 |
8 | Assessment Of The Environmental Conditions Of The Proposed Wastewater Projects (Sewage Networks,Force Mains And PS And Wastewater Treatment Plants: New Constructions And Upgrade) In Two Districts In Kafr El-Sheikh Governorate (Desouq And Motobus). Financed By EBRD European Bank For Reconstruction AndDevelopment | Cairo EGYPT | ARUP | Hydraulics | 2013 |
7 | Environmental And Social Impact Assessment For The PROPOSED Safaga Desalination Plant. The Study Emphasized The 20,000m3/Day Brine Disposal System And Their Environmental Impact On The Environment. The Purpose Of The ESIA Report Is To Obtain Permitting From The Egyptian Environmental Affairs Agency EEAA. | Cairo EGYPT | MISR Consult For Environment & Infrastructures (Branch Office) | Hydraulics | 2013 |
6 | ESIA Study For The Landfill Of El- Kharg City In Riyadh Region. The Study Included Field Measurements Of Air Quality, Water Quality And Soil Quality. The Assessment Included The Proposed Recycling. | Riyadh KSA | EL-MOHAYED – MISR Consult | Environment | 2013 |
5 | Environmental And Social Impact Assessment For The PROPOSED Al- Yousr Desalination Plant (Treated Water Capacity 40,000m3/Day). The Study Emphasized The 120,000m3/Day Brine Disposal System And Their Environmental Impact On The Environment. The Study Also Included Hydraulic Study For The Intake Lines From The Sea As Well As Disposal System To The Deep Marine Waters. The Purpose Of The ESIA Report Is To Obtain Permitting From The Egyptian Environmental Affairs Agency EEAA. | Cairo EGYPT | Hydraulics | 2013 | |
4 | Environmental And Social Impact Assessment For The PROPOSED Wastewater Treatment Plant In KENANAH Compound Project Owned And Operated By ORASCOM Cooperative Ousting Company.The Purpose Of The ESIA Report Is To Obtain Permitting From The Egyptian Environmental Affairs Agency EEAA. | Cairo EGYPT | ORASCOM For Cooperative Housing | Hydraulics | 2012 |
3 | Technical Support And Capacity Building Services To The Four Affi Liated Companies Of The Holding Company Of Water And Wastewater HCWW In Gharbia, Sharkia, Behaira And Damietta Governorates. In Close Coordination With The Short Term International EIA Expert And Senior Water/Wastewater Key Expert. | Cairo EGYPT | RODECOGmbH, Germany – HCWW Holding Company For Water And Wastewater | Hydraulics | 2011 |
2 | Environmental And Social Impact Assessment For The EXISTING Wastewater Treatment Plant In Haram City Compound Owned And Operated By Orascom Cooperative Housing Company,The Purpose Of The ESIA Report S To Obtain Permitting From The Egyptian Environmental Affairs Agency EEAA. | Cairo EGYPT | ORASCOM For Cooperative Housing | Hydraulics | 2011 |
1 | Water Supply Riyadh City-Sadd Wasia Lot-6 | Riyadh-KSA NWC | NWWC | WaterTreatment | 2010 |