No. | Name of Project | Location | Client | Project Type | Date | SEC Approval | WCC |
18 | High Voltage Interference Calculation for Gas Pipeline | RIYADH | Al-Shahin Metal Industries | STUDIES | 2022 | ||
17 | HIGH VOLTAGE INTERFERENCE CALCULATION FOR GAS PIPELINE OF D/C OHTL FROM URAIDH S/S 8374UP TO BSP 9048, IN RIYADH AREA. | RIYADH | TDP COMPANY | STUDIES | 2022 | ||
16 | STEAM TURBINE GENERATORS AT SHEDGUM GAS PLANT PROJECT | KSA | ENNPI | ICS study OTSS Study | 2022 | ||
15 | ICS For Safaniy ah Debottlenock Onshore Plants S/S | Safaniyah – KSA Aramco | GE | STUDIES | 2020 | ||
14 | ICS (Insulation Coordination Study) for Zuluf Plants S/S | Zuluf – KSA Aramco | GE | STUDIES | 2020 | ||
13 | ICS (Insulation Coordination Study) For Jubail-II 230/13.8 KV S/S | Jubail-KSA Aramco | GE | STUDIES | 2020 | ||
12 | nsulation coordination Study : Expansion Of Najran 380 KV BSP S/S & FRA 380 KV S/S | ABHA-KSA NG-SOA | ASSYSTEM | STUDIES | 2020 | ||
11 | Technical Study Report At Both 9053 & Shedgum | DAMMAM-KSA NG -EOA | Al-TOUKHI Co. | STUDIES | 2020 | ||
10 | Shoaiba Relays Setting | JEDDAH-KSA SWCC | Al-FANAR Co. | STUDIES | 2020 | ||
9 | Site Services for RABIGH JETTY-2 | JEDDAH-KSA SWCC | MSCL | STUDIES | 2020 | ||
8 | Insulation Coordination Study : SFNY TP-21 | KSA | GE End client : Aramco | STUDIES | 2019 | ||
7 | Insulation Coordination Study: Shuqaiq 380/132 Kv BSP S/S | KSA | GE End Client : SEC | STUDIES | 2019 | ||
6 | Insulation coordination Study : FRA 380/132/13.8 KV BSP S/S | KSA | Al Gihaz (AG) End Client : SEC | STUDIES | 2019 | ||
5 | Insulation Coordination Study for SAFANIYA TP-21 115 /13.8 KV S/S | SAFANIYA – KSA | GE | STUDIES | 2018 | ||
4 | Insulation Coordination Study : 11k SS Project | KSA | SIEMENS End client : Royal commission | STUDIES | 2018 | ||
3 | INSULATION COORDINATION STUDY – FADHILI Gas Processing Plant – PR 4032610. | KSA | GE END CLIENT: ARAMCO | STUDIES | 2016 | ||
2 | ETAP COORDINATION STUDY IN SUBSTATION-42 YANBU ROYAL | YANBU-KSARoya Comission | Al-HAIF | STUDIES | 2016 | ||
1 | High voltage interference study and calculation report for EPWTS-2 Pipeline PS1 To Dammam. | KSA | YUKSEL End Client: SWCC | STUDIES | 2015 |