| No. | Name of Project | Location | Client | Project Type | Date |
| 3 | High voltage interference calculation for Gas Pipeline of D/C OHTL from URAIDH S/S 8374UP to BSP 9048, in RIYADH area. | RIYADH KSA | TDP company | STUDIES | 2022 |
| 2 | High Voltage Interference Calculation for Gas Pipeline | RIYADH KSA | Al-Shahin Metal Industries | STUDIES | 2022 |
| 1 | High voltage interference study and calculation report for EPWTS-2 Pipeline PS1 To Dammam. | DAMMAM KSA | YUKSEL End Client: SWCC | STUDIES | 2015 |