Protection And Distribution

No. Name of Project Location Client Project Type Date
32 REPLACEMENT OF 110KV OHTL CIRCUITS ARAFAT (ARF-1)-ARAFAT 2(ARF2) A & B IN MAKKAH-WESTERN OPERATING AREA. (UNDERGROUND CABLE PORTION) WOA MAKKAH Eastern Union ContractigCo Protection
modifications
2026
31 Construction of 380KV UG cables from King Salman Park (KSP) BSP- 9083 to Metro Northeast#9053 COA NATIONAL
GRID SA

Protection

modifications

2026
30 HAIL SS BESS  SYSTEM HAIL Alfanar BESS 2025
29 POWER SUPPLY FOR RABIGH-4 PROJECT (SWPCRAB-4) Western Region Deep
Dimension
Contracting Company (DDCC)

UGC &

Extension

2024
28 CONSTRUCTION OF 132kV U/G CABLE BETWEEN KHAMIS SOUTH AND KKAB IN ASIR REGION-SOA ASIR SOA Mastoura UGC &
Extension
2024
27 REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUIT BETWEEN ABHOUR
SOUTH SUBSTATION – NAHDAH
SUBSTATION
WOA OJAIMI

Protection

modifications

2024
26 Installation of Power Transformer for Jazan Medical City SOA Nesma Protection
modifications
2024
25 EXTENSION OF MV SWGR AT 110- 13.8 kV TAIBA UNIVERSITY WOA Nesma

Protection

modifications

2024
24 REVISED CONNECTION REINFORCEMENT OF SHAMIYAH-1 & SHAMIYAH-2 SUBSTATIONS WITH MKC BSP (110KV UNDERGROUND CABLES PORTION) WOA CEPCO Protection
modifications
2024
23 REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUITS SEA SIDE SUBSTATION -KHALIDIYAH BSP (110KV UNDERGROUND CABLES PORTION) WOA CEPCO

Protection

modifications

2024
22 Replacements & Reinforcement Jabal Al Noor 110/13.8 KV S/S Mekkah-KSA
(SEC-WOA)
Ojaimi HV S/S 2021
21 Upgrading Protection Equipment in 132kv S/S Abha-KSA
(SEC -SOA)
Al – Fanar HV S/S 2021
20 ICS For Sfaniy ah Debottlenock Onshore Plants Safaniyah SA
Aramco
GE PV / Engineering & Studies 2020
19 ICS for Zuluf Plants Zuluf – KSA
Aramco
GE PV /
Engineering & Studies
2020
18 Shoaiba Relays Setting JEDDAH-KSA SWCC Al-FANAR Co. STUDIES 2020
17 Insulation Coordination Study SFNY TP-21 KSA GE End client : Aramco PV / Engineering & Studies 2019
16 AL-KHARJ 33/13.8 KV # 7723- Reinforcement AL-KHARJ-KSA
(NG- COA)
ZAMIL PROJECTS COMPANY MV S/S 2017
15 Reinforcement of AL KHARJ 7703 33/13.8KV S/S Riyadh-KSA
(NG-SOA)
AL-HAIF MV S/S 2017
14 INSULATION COORDINATION STUDY – FADHILI Gas Processing Plant – PR 4032610. KSA GE End client : Aramco PV / Engineering & Studies 2016
13 NABAJ, Reinforcement 33/ 13.8 KV S/S Taparjal -KSA
(NG-EOA)
TAQQAT MV S/S 2016
12 Reinforcement of SHAROURA 132/33KV (PP2) S/S SHAROURA – KSA
(NG-SOA)
Al- GIHAZ  (AG) HV S/S 2016
11 AL-MUZAHMlAH Colleges Complex 132/13.8 KV S/S #8522-Reinforcement Riyadh – KSA
(NG-COA)
Al-BABTIN (ABC) HV S/S 2016
10 UQLAT AL-SUQUR, 132/33 KV S/S # 8806 – Reinforcement AL-QASSIM-KSA
(NG-COA)
AL-
MASHARIQ
(AMC)
HV S/S 2014
9 RUFFEIDAH, 33KV S/S – Reinforcement RUFFEIDAH-KSA
(NG-SOA)
AL-GIHAZ
(AG)
MV S/S 2014
8 SUFFA , 110/13.8KV S/S – Reinforcement SUFFA-KSA
(NG-SOA)
AL-GIHAZ
(AG)
HV S/S 2014
7 MASHAER BSP REINFORCEMENT 380/110/13.8 KV BSP -Interconnection MAKKAH-KSA
(NG-WOA)
DELTA EHV S/S 2013
6 JIZAN CPS2, 132/13.8 KV S/S -Reinforcement JIZAN-KSA
(NG-SOA)
ABB HV S/S 2012
5 AL-JILLAH, 132/33 KV S/S # 8076 – Reinforcement AL-JILLAH-KSA
(NG-COA)
ABB HV S/S 2011
4 AMRS – AUTOMATIC METER READING SYSTEM NO. 288 S/S IN Western (NG – WOA
SOA)
AUVA Protection Work 2011
3 AL-BIRK, 33KV S/S – Reinforcement  TOHAMA KSA
NG-SOA)
AL-GIHAZ
(AG)
MV S/S 2009
2 ZAFEER, 33/13.8 KV S/S – Reinforcement ZAFEER-KSA
(NG-SOA)
AL-GIHAZ
(AG)
HV S/S 2006
1 KKAB-KHAMIS MISHAIT, 132/13.8 KV S/S-Reinforcement Khamis Mushait
KSA
( NG-SOA)
AL-GIHAZ
(AG)
HV S/S 2005