Protection And Distribution

No.Name of ProjectLocationClientProject TypeDate
28HAIL SS BESS  SYSTEMHAILAlfanarBESS2025
27REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUIT BETWEEN ABHOUR
SOUTH SUBSTATION – NAHDAH
SUBSTATION
WOAOJAIMIProtection modifications2024
26Installation of Power Transformer for Jazan Medical CitySOANesmaProtection
modifications
2024
25EXTENSION OF MV SWGR AT 110- 13.8 kV TAIBA UNIVERSITYWOANesmaProtection
modifications
2024
24REVISED CONNECTION REINFORCEMENT OF SHAMIYAH-1 & SHAMIYAH-2 SUBSTATIONS WITH MKC BSP (110KV UNDERGROUND CABLES PORTION)WOACEPCOProtection
modifications
2024
23REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUITS SEA SIDE SUBSTATION – KHALIDIYAH BSP (110KV UNDERGROUND CABLES PORTION)WOACEPCO

Protection

modifications

2024
22Replacements & Reinforcement Jabal Al Noor 110/13.8 KV S/SMekkah-KSA
(SEC – WOA)
OjaimiHV S/S2021
21Upgrading Protection Equipment in 132kv S/SAbha-KSA
(SEC – SOA)
Al – FanarHV S/S2021
20ICS For Sfaniy ah Debottlenock Onshore PlantsSafaniyah SA
(Aramco)
GEPV / Engineering & Studies2020
19ICS for Zuluf PlantsZuluf – KSA
(Aramco)
GEPV / Engineering & Studies2020
18Shoaiba Relays SettingJEDDAH-KSA (SWCC)Al-FANAR Co.STUDIES2020
17Insulation Coordination Study SFNY TP-21KSAGE End client :
Aramco
PV / Engineering & Studies2019
16AL-KHARJ 33/13.8 KV # 7723- ReinforcementAL-KHARJ-KSA
(NG –  COA)
ZAMIL PROJECTS COMPANYMV S/S2017
15Reinforcement of AL KHARJ 7703 33/13.8KV S/SRiyadh-KSA
(NG – SOA)
AL-HAIFMV S/S2017
14INSULATION COORDINATION STUDY – FADHILI Gas Processing Plant – PR 4032610.KSAGE End client :
Aramco
PV / Engineering & Studies2016
13NABAJ, Reinforcement 33/ 13.8 KV S/STaparjal -KSA
(NG – EOA)
TAQQATMV S/S2016
12Reinforcement of SHAROURA 132/33KV (PP2) S/SSHAROURA -KSA
(NG – SOA)
Al- GIHAZ  (AG)HV S/S2016
11AL-MUZAHMlAH Colleges Complex 132/13.8 KV S/S #8522-ReinforcementRiyadh – KSA
(NG – COA)
Al-BABTIN (ABC)HV S/S2016
10UQLAT AL-SUQUR, 132/33 KV S/S # 8806 – ReinforcementAL-QASSIM-KSA
(NG – COA)
AL- MASHARIQ (AMC)HV S/S2014
9RUFFEIDAH, 33KV S/S – ReinforcementRUFFEIDAH-KSA
(NG – SOA)
AL-GIHAZ
(AG)
MV S/S2014
8SUFFA , 110/13.8KV S/S – ReinforcementSUFFA-KSA
(NG – SOA)
AL-GIHAZ
(AG)
HV S/S2014
7MASHAER BSP REINFORCEMENT 380/110/13.8 KV BSP -InterconnectionMAKKAH-KSA
(NG – WOA)
DELTAEHV S/S2013
6JIZAN CPS2, 132/13.8 KV S/S -ReinforcementJIZAN-KSA
(NG – SOA)
ABBHV S/S2012
5AL-JILLAH, 132/33 KV S/S # 8076 – ReinforcementAL-JILLAH-KSA
(NG – COA)
ABBHV S/S2011
4AMRS – AUTOMATIC METER READING SYSTEM NO. 288 S/S IN Western(NG – WOA SOA)AUVAProtection Work2011
3AL-BIRK, 33KV S/S – Reinforcement TOHAMA-KSA
NG – SOA)
AL-GIHAZ
(AG)
MV S/S2009
2ZAFEER, 33/13.8 KV S/S – ReinforcementZAFEER-KSA
(NG – SOA)
AL-GIHAZ
(AG)
HV S/S2006
1KKAB-KHAMIS MISHAIT, 132/13.8 KV S/S-ReinforcementKhamis Mushait
KSA
( NG  – SOA)
AL-GIHAZ
(AG)
HV S/S2005