No. | Name Of Project | Location | Client | Project Type | Date |
23 | 110kV OHTL Between Al-Salam BSP Substation And Bawat Substation In Madinah-48KM | JEDDAH-KSA NG -WOA | Raissy | OHTL | 2021 |
22 | 132kv OHTL From S/S 8720 To Looping Point 8721-8720 | RIYADH-KSA SEC -COA | TDP | OHTL | 2021 |
21 | Misk Modification In Tower & Gantry | Tabuk-KSA SEC -WOA | TDP | OHTL | 2021 |
20 | Al-Dawadmi Housing S/S 8610 With 132KV Network For The Review & Stamp | Dawadmi-KSA SEC-COA | TDP | OHTL | 2021 |
19 | 132KV DC OHL FROM NEW KING FAISAL COLLEGE S/S 8533 UPTO BSP S/S 9064, IN MAJMA AREA | RIYADH-KSA SEC -COA | Trading & Development Partnership (TDP) | OHTL | 2020 |
18 | DHP-1 132/13.8kv S/S With Remote Ends | Jazan-KSA SEC -SOA | Trading & Development Partnership (TDP) | OHTL | 2020 |
17 | 132KV DC OHTL Looping T/L To New DHP-1 132/13.8kv S/S P1& P2 | Jazan-KSA SEC -SOA | Trading & Development Partnership (TDP) | OHTL | 2020 |
16 | 132 KV OHTL QURAYYAT SS | QURAYYAT-KSA | AL-OSAIS | OHTL | 2020 |
15 | King Faisal College 132 KV DC OHTL, S/S(8533) Up To BSP S/S 9064 | Majma – KSA SEC – COA | Trading & Development Partnership (TDP) | TL | 2020 |
14 | Shifting Of Tower Of Existing 132 KV D/C – 8096 -9023 Al Shahin Project (3.2 KM) | Riyadh-KSA / (NG-COA) | PTC | TL | 2019 |
13 | RETROFITTING OF EXISTING 132KV OHL#9063-8522 | Riyadh-KSA (SEC-COA) | PTC | TL | 2019 |
12 | Loop In Loop Out The Existing SAZSHBS , MW-SHBS Double Circuit 380 KV OHTL | “Al Kharj – KSA (NG-COA)” | Al-BABTAIN / (ABC) | TL | 2018 |
11 | Underground Transmission Line (UGTL) From KKUC-1 To FRA BSP | ABHA – KSA / (SEC-SOA) | AL-GIHAZ / (AG) | TL | 2018 |
10 | DC 132KV OHTS Line For NEW Al-Tawdihiah-2 S/S #8725 | “Al Kharj – KSA (NG-COA)” | Al-BABTAIN / (ABC) | TL | 2017 |
9 | OHTL BETWEEN S/S 8071 & S/S 8005 | “Riyadh – KSA (SEC-COA)” | IBN OMAIRAH Co. (IOC) | TL | 2016 |
8 | 115 KV OHTl & U/G Cables | “Fadhili – KSA / (SEC-EOA)” | ARAMCO | TL | 2016 |
7 | AL-BADI, 132/33KV S/S #8767, (Connection Of Al Badi S/S 8767 With 132kv Network) | KHARAJ – KSA ( NG-COA) | Al-BABTAIN (ABC) | TL | 2016 |
6 | 380KV D/C OHTL ALWAJH- UMLUG | UMLUG-KSA / SEC -WOA Wasela | WASELA | TL | 2016 |
5 | Connection Of Al Badi S/S 8767 With 132 KV Network | “KHARAJ – KSA (NG-COA)” | Al-BABTAIN (ABC) | TL | 2016 |
4 | 115KV DOUBLE CIRCUIT OHTL And UG Cable In Fadhili-2 | FADHILI – KSA ARAMCO | Al-BABTAIN (ABC) | TL | 2016 |
3 | MADINA-DHUBA, 380 KV D/C OHTL | MADINAH-DHU BA-KSA (NG-WOA) | HYUNDAI ENGINEERING& CONSTRUCTION | TL | 2015 |
2 | 132 KV OHL ,JIZAN INDUSTRIAL | “Jizan-KSA (SEC-SOA)” | AL-GIHAZ / (AG) | TL | 2009 |
1 | SHOAIBA 110 KV OHL- Between ICY5 S/S & Shoaiba S/S | “SHOAIBA-KSA (NG-WOA)” | AL-GIHAZ / (AG) | TL | 2008 |