| No. | Name of Project | Location | Client | Project Type | Date |
| 32 | CONSTRUCTION OF NEW 132-13.8kV SWCC S/S 8330 | CENTERAL | MAPA | ICS / TRANSIENT ANALYSIS | 2025 |
| 31 | P24101001 Hajer2 380KV PSP | Eastern Area (KSA) | GE | ICS / TRANSIENT ANALYSIS | 2024 |
| 30 | INSTALL C3 C4 REFRIGERATION UNITS&STORAGE TANKS JNGLF | Jafurah – Eastern Province – Saudi Arabia |
ENPPI– ARAMCO | ARMCO Relay Coordination & ARC FLASH& Harmonic Analysis by ETAP |
2023 |
| 29 | Jafurah – Juaymah Terminal Expansion | Jafurah – Eastern Province – Saudi Arabia |
ENPPI– ARAMCO |
ARC FLASH by Etap / Relay coordination by Etap |
2023 |
| 28 | 120MW Solar Plant – ADEN YEMEN project | ADEN – YEMEN | WSP | Load Flow by Etap Reactive Power calculation |
2023 |
| 27 | SHOIBAH SWCC-2 | on the coast of Red Sea, about 120 kilometres (75 mi) south of Jeddah – Saudi Arabia | Ali SHAR Khatib-Alami Water Transmission And Technologies Co | ICS / GT | 2023 |
| 26 | Expansion of AR-RASS PV 380- 132kV BSP 9095 | Al Qassim Province- Saudi Arabia |
Albabtain – (ABC – SEC) |
ICS / NGR | 2023 |
| 25 | 380-132kV SAAD PV BSP-9094 | Riyadh Region – Saudi Arabia |
Alsherief Group SEC |
ICS | 2022 |
| 24 | High Voltage Interference Calculation for Gas Pipeline | RIYADH | Al-Shahin Metal Industries |
STUDIES | 2022 |
| 23 | HIGH VOLTAGE INTERFERENCE CALCULATION FOR GAS PIPELINE OF D/C OHTL FROM URAIDH S/S 8374UP TO BSP 9048, IN RIYADH AREA. | RIYADH | TDP COMPANY |
STUDIES | 2022 |
| 22 | STEAM TURBINE GENERATORS AT SHEDGUM GAS PLANT PROJECT | KSA | ENNPI | ICS study OTSS Study |
2022 |
| 21 | Overall electrical studies at SHEDGUM GAS PLANT | Eastern Province – Saudi Arabia | ENPPI – ARAMCO | ICS / TRANSIENT ANALYSIS |
2021 |
| 20 | EXPANSION OF NAJRAN UNIVERSITY (NJR) BSP | NAJRAN – Saudi Arabia |
SEC | ICS / NGR | 2021 |
| 19 | Construction of Al bayan 9097 BSP | RIYADH – Saudi Arabia | TRADING & DEVELOPMT PARTNERSH CO SEC |
ICS / NGR | 2021 |
| 18 | EXPANSION OF AL-FARA 380KV BSP | AL Fara – Saudi Arabia |
SEC | ICS | 2020 |
| 17 | Safaniya |
Dhahran on the coast of the Persian Gulf, Saudi Arabia |
GE – Enppi – Aramco |
ICS study OTSS Study |
2020 |
| 16 | PS1 – PS2 – PS3 | JUBAIL-Eastern Province – Saudi Arabia |
GE RIYADH WATER TRANSMISSN SYSTEM |
Relay coordination by Etap |
2020 |
| 15 | ICS For Safaniy ah Debottlenock Onshore Plants S/S | Safaniyah- KSA Aramco |
GE | STUDIES | 2020 |
| 14 | ICS (Insulation Coordination Study) for Zuluf Plants S/S | Zuluf – KSA Aramco |
GE | STUDIES | 2020 |
| 13 | ICS (Insulation Coordination Study) For Jubail-II 230/13.8 KV S/S | Jubail-KSA Aramco |
GE | STUDIES | 2020 |
| 12 | Insulation coordination Study : Expansion Of Najran 380 KV BSP S/S & FRA 380 KV S/S | ABHA-KSA NG-SOA |
ASSYSTEM | STUDIES | 2020 |
| 11 | Technical Study Report At Both 9053 & Shedgum | DAMMAM-KSA NG -EOA |
Al-TOUKHI Co. | STUDIES | 2020 |
| 10 | Shoaiba Relays Setting | JEDDAH-KSA SWCC |
Al-FANAR Co. | STUDIES | 2020 |
| 9 | Site Services for RABIGH JETTY-2 | JEDDAH-KSA SWCC |
MSCL | STUDIES | 2020 |
| 8 | Insulation Coordination Study : SFNY TP-21 | KSA | GE End client: Aramco | STUDIES | 2019 |
| 7 | Insulation Coordination Study: Shuqaiq 380/132 Kv BSP S/S | KSA | GE End Client: SEC | STUDIES | 2019 |
| 6 | Insulation coordination Study : FRA 380/132/13.8 KV BSP S/S | KSA | Al Gihaz (AG) End Client : SEC |
STUDIES | 2019 |
| 5 | Insulation Coordination Study for SAFANIYA TP-21 115 /13.8 KV S/S | SAFANIYA – KSA |
GE | STUDIES | 2018 |
| 4 | Insulation Coordination Study : 11k SS Project | KSA | SIEMENS End client : Royal commission | STUDIES | 2018 |
| 3 | INSULATION COORDINATION STUDY – FADHILI Gas Processing Plant -PR 4032610. | KSA | GE END CLIENT: ARAMCO | STUDIES | 2016 |
| 2 | ETAP COORDINATION STUDY IN SUBSTATION-42 YANBU ROYAL | YANBU-KSARoya Comission |
Al-HAIF | STUDIES | 2016 |
| 1 | High voltage interference study and calculation report for EPWTS-2 Pipeline PS1 To Dammam. | KSA | YUKSEL End Client : SWCC | STUDIES | 2015 |