| No. | Name of Project | Location | Client | Project Type | Date |
| 28 | HAIL SS BESS SYSTEM | HAIL | Alfanar | BESS | 2025 |
| 27 | REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUIT BETWEEN ABHOUR SOUTH SUBSTATION – NAHDAH SUBSTATION | WOA | OJAIMI | Protection modifications | 2024 |
| 26 | Installation of Power Transformer for Jazan Medical City | SOA | Nesma | Protection modifications | 2024 |
| 25 | EXTENSION OF MV SWGR AT 110- 13.8 kV TAIBA UNIVERSITY | WOA | Nesma | Protection modifications | 2024 |
| 24 | REVISED CONNECTION REINFORCEMENT OF SHAMIYAH-1 & SHAMIYAH-2 SUBSTATIONS WITH MKC BSP (110KV UNDERGROUND CABLES PORTION) | WOA | CEPCO | Protection modifications | 2024 |
| 23 | REPLACEMENT AND REROUTING OF 110KV UNDERGROUND CABLE CIRCUITS SEA SIDE SUBSTATION – KHALIDIYAH BSP (110KV UNDERGROUND CABLES PORTION) | WOA | CEPCO | Protection modifications | 2024 |
| 22 | Replacements & Reinforcement Jabal Al Noor 110/13.8 KV S/S | Mekkah-KSA (SEC-WOA) | Ojaimi | HV S/S | 2021 |
| 21 | Upgrading Protection Equipment in 132kv S/S | Abha-KSA (SEC -SOA) | Al – Fanar | HV S/S | 2021 |
| 20 | ICS For Sfaniy ah Debottlenock Onshore Plants | Safaniyah SA Aramco | GE | PV / Engineering & Studies | 2020 |
| 19 | ICS for Zuluf Plants | Zuluf – KSA Aramco | GE | PV / Engineering & Studies | 2020 |
| 18 | Shoaiba Relays Setting | JEDDAH-KSA SWCC | Al-FANAR Co. | STUDIES | 2020 |
| 17 | Insulation Coordination Study SFNY TP-21 | KSA | GE End client : Aramco | PV / Engineering & Studies | 2019 |
| 16 | AL-KHARJ 33/13.8 KV # 7723- Reinforcement | AL-KHARJ-KSA (NG- COA) | ZAMIL PROJECTS COMPANY | MV S/S | 2017 |
| 15 | Reinforcement of AL KHARJ 7703 33/13.8KV S/S | Riyadh-KSA (NG-SOA) | AL-HAIF | MV S/S | 2017 |
| 14 | INSULATION COORDINATION STUDY – FADHILI Gas Processing Plant – PR 4032610. | KSA | GE End client : Aramco | PV / Engineering & Studies | 2016 |
| 13 | NABAJ, Reinforcement 33/ 13.8 KV S/S | Taparjal -KSA (NG-EOA) | TAQQAT | MV S/S | 2016 |
| 12 | Reinforcement of SHAROURA 132/33KV (PP2) S/S | SHAROURA -KSA (NG-SOA) | Al- GIHAZ (AG) | HV S/S | 2016 |
| 11 | AL-MUZAHMlAH Colleges Complex 132/13.8 KV S/S #8522-Reinforcement | Riyadh – KSA (NG-COA) | Al-BABTIN (ABC) | HV S/S | 2016 |
| 10 | UQLAT AL-SUQUR, 132/33 KV S/S # 8806 – Reinforcement | AL-QASSIM-KSA (NG-COA) | AL-MASHARIQ (AMC) | HV S/S | 2014 |
| 9 | RUFFEIDAH, 33KV S/S – Reinforcement | RUFFEIDAH-KSA (NG-SOA) | AL-GIHAZ (AG) | MV S/S | 2014 |
| 8 | SUFFA , 110/13.8KV S/S – Reinforcement | SUFFA-KSA (NG-SOA) | ALGIHAZ (AG) | HV S/S | 2014 |
| 7 | MASHAER BSP REINFORCEMENT 380/110/13.8 KV BSP -Interconnection | MAKKAH-KSA (NG-WOA) | DELTA | EHV S/S | 2013 |
| 6 | JIZAN CPS2, 132/13.8 KV S/S -Reinforcement | JIZAN-KSA (NG-SOA) | ABB | HV S/S | 2012 |
| 5 | AL-JILLAH, 132/33 KV S/S # 8076 – Reinforcement | AL-JILLAH-KSA (NG-COA) | ABB | HV S/S | 2011 |
| 4 | AMRS – AUTOMATIC METER READING SYSTEM NO. 288 S/S IN Western | (NG – WOA -SOA) | AUVA | Protection Work | 2011 |
| 3 | AL-BIRK, 33KV S/S – Reinforcement | TOHAMA KSA ( NG-SOA) | AL-GIHAZ (AG) | MV S/S | 2009 |
| 2 | ZAFEER, 33/13.8 KV S/S – Reinforcement | ZAFEER-KSA (NG-SOA) | AL-GIHAZ (AG) | HV S/S | 2006 |
| 1 | KKAB-KHAMIS MISHAIT, 132/13.8 KV S/S-Reinforcement | Khamis Mushait KSA (NG-SOA) | AL-GIHAZ (AG) | HV S/S | 2005 |