Tathleeth Bisha - KSA - Bisha - AL-Gihaz 2012


Tathleeth 132/33 Kv S/S The objective of this project is to install two (2) 132/33 kV transformers, two (2) 33kV capacitor banks, seven (7) bays indoor 132kV switchgears (GIS) arranged in "double bus single breaker" fi...

Read More
Tathleeth  Bisha - KSA - Bisha - AL-Gihaz 2012

Siffah - KSA - Najran - AL-Gihaz 2012


Siffah 132/33 Kv S/S The objective of this project is to install two (2) 132/33 kV transformers, two (2) 33kV capacitor banks, five (5) dead tank circuit breakers arranged in an "Single bus single breaker" configuration...

Read More
Siffah - KSA - Najran - AL-Gihaz 2012

Sharurah - KSA - AL-Gihaz 2012


Sharurah 132/33/13.8 Kv PP1: three (3) 132/13.8 kV, (2) 132/33kV transformers, three (3) 13.8kV capacitor banks, nine (9) bays indoor 132kV switchgear (GIS) in "double bus single breaker" configuration, forty two (42) ...

Read More
Sharurah - KSA - AL-Gihaz 2012

Al-RUDDAF S/S - Taif - KSA - AL-Gihaz 2012


Al-RUDDAF S/S The construction of fully automated (IEC 61850) new 110/13.8kV GIS substation with 3 incoming 110kv feeder bays, 3x110/13.8kV, 50/67 MVA Power transformers, 3x7 MVAR 13.8kV Capacitor Banks as per SLD in th...

Read More
Al-RUDDAF S/S - Taif - KSA - AL-Gihaz  2012

Khaiber - Madinah - KSA - AL-Gihaz 2012


Khaiber S/S 110/33 Kv The replacement of existing 31 MVA Power Transformers with the new110/33kV, 83MVA Power Transformers and shifting the existing Power Transformers to ware house,The extension of 33kV Substation by t...

Read More
Khaiber - Madinah - KSA - AL-Gihaz 2012

ICY S/S - Madinah - KSA - AL- Gihaz 2012


ICY S/S, 110/33/13.8 Kv The extension of 110kV substation by the addition of one 110kV outdoor Power, Transformer switchgear bay complete with Control & Protection, The Addition of one 110/15kV, 40MVA ( 3rd ) Power Tran...