Completed Projects


RUFFEIDAH-QASSIM-SEC-COA-ALMASHARIQ-2014
The objective of this project is to install six (6) 33kV Switchgears at existing SUFFA 132/33kV substation in Tihama region having an altitude of less than 1000m with protection work and required civil work....





SUFFA-RIYADH AREA-SEC-COA-ALMASHARIQ-2014
The objective of this project is to install four (4) 13.8kV Switchgears at existing RUFFEIDAH 132/33/13.8kV substation in Asir region having an altitude of 2100m (approx.) with protection work and required civil work...





JEDDAH SEAPORT-Al-NARJIS-Riyadh area-SEC-COA-ALMASHARIQ-2014
The construction of fully automated (IEC 61850 based) new “110/13.8 kV Sea Port -2 Substation.” with 3 incoming 110kV feeder bays, 3x110/13.8kV, 50/67 MVA Power transformers, 3x7 MVAR 13.8kV Capacitor Banks, (2) Aux. tra...





BAB JEDDAH-Dharat Laban-SEC-COA-ALMASHARIQ-2014
The construction of fully automated (IEC 61850) new 110/13.8kV GIS substation with 3 incoming 110kv feeder bays, 3x110/13.8kV, 50/67 MVA Power transformers, 3x7 MVAR 13.8kV Capacitor Banks, along with associated MV switc...





AL-MOTAMARAT-SEC-WOA-ALGIHAZ-2013
The construction of fully automated (IEC 61850) new 110/13.8 kV substation with Four (4) incoming 110kV feeder bays along with associated MV switch gear including Thirty Four (34) outgoing cable feeders in a time frame a...





GULF SALMAN-JEDDAH-SEC-WOA-ALGIHAZ-2013
, Construction of new 110/13.8kv in Jeddah area with the following: One (1) no.110kV SF6 Gas Insulated Switchgear (GIS) with ten (9) nos., 110kV GIS Circuit Breakers and associated equipment, three (3) nos., 110/13.8kV,...